Building our House – Week 10

It amazes me how much progress has been made on the house in just 10 weeks!  Marvin and his crew are working very hard and last week was no exception.  The concrete floor on the other (kitchen) side of the house was completed.

Pouring the balance of the second floor

Pouring the balance of the second floor

Back on the other side of the house, some of the Panacor panels were put into place within the steel frames of the walls.  The panels are placed over and attached to the re-bar anchors sticking up out of the concrete floor.  Then the panels are stitched to each other with wire and also fastened to the top structural member.

The Panacor foam panels are starting to go in the walls of the second floor guest suite.

IMG_0318e

Here you can also see a portion of the stairway being formed.

Once the concrete floor on the kitchen side of the house had set up sufficiently, work began to frame the walls.

IMG_0313e

The steel framing is being welded together.

IMG_0314eIMG_0317e

IMG_0320e

In the photos above, you can also see that the remaining crown beam that runs along the top of the block walls has been formed and poured.  The other addition this week was the fabrication and installation of most of the steel beams that will support the roof over the terrace around the swimming pool.  You can see them in the photographs above and a closer view is shown below.

IMG_0305e

IMG_0309e

This is looking down on the entryway to the front door.

IMG_0307e

This is where the other stairway will go (to the guest bedroom and study above the kitchen and bodega). Underneath this stairway will be a small pantry off the kitchen.

IMG_0303e

Here the guys are working on the stairway to the guest suite.

IMG_0323e

Hasta la proxima semana….Until next week!

Building our House – Week 9

Onward and upward…work has started on the structure of the second floor.  Rather than using concrete block as for the first floor, the second floor walls will be constructed using a steel frame and Styrofoam panels, which are subsequently sprayed with a concrete layer.  The final result will look the same as the concrete block, but is quite a bit lighter weight and does provide some insulating qualities.  The photographs below shows the steel framing being erected on the left side of the house.

IMG_3451e IMG_3452eIMG_3462e

Below is a photograph of the Styrofoam panels known as Panacor.  As you can imagine, building with these panels is much quicker than with traditional concrete block.  Installing electrical and plumbing lines inside these walls is simply a matter of cutting a channel in the foam and fishing the conduit or tubing behind the wire mesh before the concrete is sprayed on.

IMG_3454e

The pool equipment room walls were built with concrete block and a concrete roof was poured.  I think the pool pump and filter could withstand a nuclear holocaust in there.

IMG_3455e

Over on the right side of the house, the crown beam and floor have been formed and is just about ready for concrete.  A ramp was built for the guys to bring concrete up in wheel barrows.

IMG_3477e

This is the temporary support framing under the second floor above the kitchen area.

This is the temporary support framing under the second floor above the kitchen area.

This coming week should be interesting as the second floor walls start to take shape with the Panelcor panels being installed.

 

Building our House – Week 8

Activity over this last week was concentrated mostly on getting one half of the second floor concrete poured, as well as building the walls of the pool.

Upper section of the pool walls are formed and ready for concrete.  In the background the forming of the crown beam be seen on the house.

Upper section of the pool walls are formed and ready for concrete. In the background the forming of the crown beam be seen on the house.

The left section of the house is formed and ready to pour the concrete floor and crown beams

The left section of the house is formed and ready to pour the concrete floor and crown beams

IMG_3442e

Routing of the supply and suction lines from the pool to the pool equipment room

Routing of the supply and suction lines from the pool to the pool equipment room

This is the beginning of the pool equipment room which is dug into the front of the plantel

This is the beginning of the pool equipment room which is dug into the front of the plantel

The pool walls have been poured.

The pool walls have been poured.

IMG_3445e

Check out this short video of the workers moving concrete up to the second floor.

The second floor concrete is poured and forms have been removed.

The second floor concrete is poured and forms have been removed.

Here are a couple of our wildlife friends that visited us this week at our rental house.

A fiery-billed aracari

A fiery-billed aracari

A green iguana in the tree - to keep away from the dogs!

A green iguana in the tree – to keep away from the dogs!

Building our House – Week 7

Wow, things are really moving along quickly!  Week 7 was a busy and productive one, so there are many things to show you.  The last of the concrete columns within the first floor walls was completed and the remaining re-bar of the crown beam was put into place.  Then work started on installing the steel beams that support the concrete floor of the second level.

(As a reminder, you may click on any of the photos in the blog to see an enlarged version)

Steel beams going in to support the second floor.

Steel beams being installed for support of the second floor.

Steel support structure for the floor of the second level

Steel support structure for the floor of the second level

All of the re-bar for the crown beams has been put in place

All of the re-bar for the crown beams has been put in place

On top of the steel beams, a zinc sheeting is put down upon which the concrete floor will be poured.

Second floor decking being put in place

Second floor decking being put in place

The second floor decking above the kitchen area

The second floor decking above the kitchen area

IMG_3408e

Before pouring the concrete for the crown beams and the second floor, the plumbing and electrical conduit is run up through the floor as shown in the photograph above and below.

A view under the deck of the second floor guest suite bathroom of the plumbing lines.

A view under the deck of the second floor guest suite bathroom of the plumbing lines.

Framing of a master bath window

Framing of a master bath window

Marvin Montoya and his team of guys are doing a great job.  Everyone seems to enjoy what they are doing – always having fun, joking around or singing.  They know how to build a quality home and are really working hard to make it happen.  Costa Rican men are generally not the biggest guys, but they sure are strong.  For instance, the other day when the delivery truck came with a load of materials, including 70 110-pound sacks of cement, they unloaded it like it was nothing.  During the week, some of the crew lives on site – in very modest accommodations.  They have a small “house” with some bunk-beds built in and a small kitchen with a sink, gas cook top and a refrigerator.  Outside there is a shower and an outhouse.

Here is the kitchen sink and shower for the workers next to their quarters

Here is the kitchen sink and shower for the workers next to their quarters

El Baño

El Baño nestled in a private, shady location among the trees

Much progress has also been made on one of my favorite things… the pool!  The concrete floor was poured and the walls started.  Of course one needs a sheltered place that is out of the way to locate the pool equipment, mainly the pump and filter.  We decided to put it at the front of the plantel (building site) dug down into the earth, so it will be hidden.

The pool is taking shape

The pool is taking shape

The pool equipment room is dug

The pool equipment room is being dug here at the front edge of the plantel.

A view across the pool looking at the first floor master suite

A view across the pool looking at the first floor master suite

We have also started to look at some finishes, such as floor tile.  There are a massive number to choose from, but we managed to find one that we really like for use in the majority of the house.  It’s a porcelain tile with a nice natural stone pattern and texture, so it will not be slippery or show the dirt much.  For the bathrooms, we plan to select something different.

This is the primary floor tile we are using through most of the house.

This is the primary floor tile we are using through most of the house.

A view into the carport

A view into the carport

In the carport, above is the floor structure of the guest bathroom on the second floor.

In the carport, above is the floor structure of the guest bathroom on the second floor.

Construction of a circular column...re-bar reinforcement inside the white plastic form.

Construction of a circular column…looking down at the re-bar reinforcement inside the white plastic form. Ready for concrete.

View of the house at the end of week 7.

View of the house at the end of week 7.

On this beautiful day as I sit at the computer putting this blog post together, this is the view I have to look at out my window….not bad, huh!!!

IMG_3430e

Building our House – Week 6

IMG_3401e

Overcast skies were predominant during this week.

There was a little more rain this week, which made the building site a bit muddy, but it didn’t slow down the workers too much.  These photos were taken today (Saturday), so none of the construction crew was there.  They normally work 6am to 5pm, Monday through Friday, and have the weekends to recuperate.

View of Manuel Antonio

View of Manuel Antonio

IMG_3390e

Work continued this week on forming the structural columns in the walls.  Re-bar cages which reinforce the crown beams have been placed at the top of the walls.  Next week the forms will be constructed which will shape the crown beams.

IMG_3392eIMG_3399e

In addition, the swimming pool is taking shape.  The re-bar of the pool floor and walls was bent and put in place.

IMG_3403e

This is looking into the entryway of the house from the carport. On the other side of the half wall on the left, we will have a nice landscaped/garden area.

IMG_3398eIMG_3397eIMG_3393e

We found this little guy on one of the railing posts around our pool at our rental house.  It was finally determined that it is a Boa.  He hides underneath a wooden plank on which we put bananas for the birds.  Not sure if he is thinking about his next meal…

IMG_3386e

Building our House – Week 5

We are at the end of the fifth week of building and progress continued to be strong.  Most all of the block for the first floor walls has been set.  Some of the plumbing waste lines and electrical boxes have been roughed in.  Forming and pouring of the structural concrete columns within the walls is underway.  The house is really taking shape now and you can see how big the various rooms are, rather than trying to imagine it when looking at the floor plan.  Eddie has been spending time at the property every day keeping an eye on the details and answering any questions that come up.

IMG_0153e

Most of the first floor walls are up. A concrete “crown” beam will be formed and poured across the top of the walls.

IMG_0150e

Kitchen wall with cut-out for microwave and cabinetry.

Several waste lines are seen in the wall. The one in the center is for the outside kitchen sink.

Several waste lines are seen in the wall. The one in the center is for the outside kitchen sink.

IMG_0151e

A stairway will go in between the two walls. The main entrance is on the right.

IMG_0148e

This is the kitchen area.

IMG_0147e

Another stairway will eventually go up in this area with a half bath under.

IMG_0146e

Master BR looking towards the living area.

IMG_0141e

Master bedroom and bathroom.

Building our House – Week 4

During this past week, much progress has been made on our house.  The guys are working really hard.  They never seem to be idle.  Yesterday, Eddie met the architect/engineer for the weekly inspection and he was amazed at how quickly things are moving along!  Fortunately, the weather is cooperating, too.  If all goes according to plan, the house should be completed sometime in March.

This is the overall site after week 4.

This is the overall site after week 4.

IMG_3353e

Walls are now going vertical. This view shows the entrance way and the carport behind, where the blocks are stacked.

IMG_3361e

Digging out the area of the swimming pool.

IMG_3360e

Swimming pool

IMG_3359e

Here the bed for the waste lines is being prepared to the proper slope.

IMG_3352e