A lot has happened theses past two weeks!  The roof tile has been installed along with the solar hot water system.  The solar company originally was scheduled to install the system in January, but they had a cancellation and asked if they could do the installation this past Friday.  Fortunately, that part of the roof had already been completed, so it worked out for them to do it.  Interestingly, they came prepared to install the system on a flat roof not a tile one.  Not too many people have flat roofs here, so Eddie was surprised that they weren’t prepared.  Our workers saved the day.  They welded a frame on which the solar panel could rest.  It took quite a while to construct.  As a result, the system installation took longer than they anticipated – an all day affair.  Eddie came up with a good idea to protect the PEX lines from the sun by using air conditioning line insulation.  The next day, he climbed up on the roof and did that work himself.

Installing the solar water heater.

Installing the solar water heater.

All connections are complete.  PEX lines (red & blue) to get covering to protect from UV rays.

All connections are complete. PEX lines (red & blue) to get covering to protect from UV rays.

The pool tile has been installed as well and now the guy is working on grouting it.  It looks awesome!  Our foreman’s young son has been up at the house this past week.  He told me he is excited about swimming in it.  He wanted to know when it would be ready.

IMG_0853eIMG_0855e

Eddie and Edgardo (our foreman) installed the PEX distribution manifold for the water lines.  Eddie has been teaching him how to work with the PEX system.  Edgardo and his father have expressed an interest in using PEX in some of their other projects.  Eddie told them he would help them with ordering, importing and installing.

PEX distribution manifold for hot and cold water lines.

PEX distribution manifold for hot and cold water lines.

Things are really moving along now with the interior space.  The tile guys finished working on the master suite bathroom and have started working on the guest suite bathroom.  Eddie and I are very pleased with both the tile selection and its installation.  The guys are doing a fantastic job!  The other day they started tiling the main floor both upstairs and downstairs.  It’s looking beautiful!

Master bath tile work underway.

Master bath tile work underway.

IMG_0840e

This is the floor tile going on the floors, other than in the bathrooms.

This is the floor tile we are using in most of the house.

The metal worker making our banister for the staircase that leads up to the guest suite came by on Monday with his crew.  It took them all day to weld the wrought iron pieces together, attach it to the stairs and paint it.  It was painted black and then a bronze finish was applied.  It’s absolutely gorgeous…a true piece of art!

Wrought iron stair railing has been installed.  It will have a wood hand rail as well.

Wrought iron stair railing has been installed. It will have a wood hand rail as well.

IMG_0852e

The workers continue to put up the wood tablilla on the ceiling.  They are now working on the two story section of the house.  It’s a lot of space to cover.

IMG_0807e

Last week, we visited the cabinet maker who is working on our kitchen, both bathroom suite vanities, interior doors, side outer door and the main door.  He and his workers have completed the frame for the kitchen island and both bathroom vanities.  They had some of the doors and drawers finished and were in the process of sanding them.  Everything looked great so far.  Eddie asked them to begin working on the two outer doors next so that they will be ready when the windows and the patio doors arrive and are installed.  That way we can secure the house.

The bathroom vanity frames are in process.

The bathroom vanity frames are in process.

Got drawers?

Got drawers?

Raw lumber (Cedro Amargo) for the doors.

Raw lumber (Cedro Amargo) for the doors.

When Eddie drives up to the lot to check on things, he usually parks his truck a little further up at the entrance of another lot that is right below our friends Toni and Gib’s house.  Gib is quite the comedian and the ultimate joker.  He always has something humorous to add to the conversation and we recently discovered that he likes to pull pranks, too.  Last week when Eddie pulled up, there was a handicapped sign in front of his parking spot!

Eddie's usual parking spot.

Eddie’s usual parking spot.

IMG_0830e

Wishing everyone a Merry Christmas and a Happy New Year!!!

Meow-y Christmas!

Meow-y Christmas!

Building Our House – Week 27

These past couple of weeks, the house has kept us quite busy.  We have spent a lot of time choosing just the right color of grout for all the tile work, colors of interior and exterior paint, and looking for bull-nose Coralina for around the pool.  Eddie spends several hours a day at the house supervising and helping out.  The next big project there will be to install the manifold for the PEX water system.

Some paint samples for the exterior.

Some paint samples for the exterior.

IMG_3774a

The PEX manifold will go in this cavity and be covered with some wooden doors.

The PEX manifold will go in this cavity and be covered with some wooden doors.

The 4 tons of tile from Santa Ana was delivered, finally!  The tile company doesn’t have their own delivery, so they get bids for you from delivery companies.  The delivery company that was deemed the most reasonable in price ended up being not so reasonable.  They held our tile “hostage” for more money when they realized exactly where we lived.  Then, the driver wouldn’t drive it all the way up the hill.  Eddie thinks he was scared because he is a city boy and not used to driving up steep hills.   The driver stopped 150 yards short of the property.  So, Eddie and a couple of the workers had to off load the tile into smaller trucks and take it the rest of the way.  It took took seven trips!  You can just imagine all the cuss words. Pura Vida.

Porcelain tile "delivery". The driver just wanted to get the tile off his truck and go.

Porcelain tile “delivery”. The driver just wanted to get the tile off his truck and go.

The guys continue to stain the tablilla (wood panels for the ceiling) and have begun installing it.  They installed the sheet rock for the ceilings in the kitchen, master suite, bodega and side entrance.  They have been working on installing the roof tile, installing ceramic wall tile in the master bathroom, prepping the pool and the stairs for the tile work.  There is always a lot going on at once.

Tablilla installed in the guest suit bathroom.

Tablilla installed in the guest suit bathroom.

And here in the entryway

And here in the entryway

Roof tile installation has started.

Roof tile installation has started.

IMG_3773a

Yesterday, we received word that our windows and sliding doors are ready for installation.  That will happen the first week in January.  It will take five days to install it all.  The solar hot water system is scheduled for January 11.  We are coming into the home stretch now!

IMG_0758a

This small closet will house the water pressure booster pump and the water filtration system.

IMG_3770a

A few steps leading to the pool equipment room were built.

Our new kitty Rusty is growing.  He has gained about a pound already.  He has such a cute personality and we’re having a lot of fun playing with him.  Rusty loves to be outside playing with sticks, little bugs and Lopez’s dogs.  He tries to play with Pacho, Lopez’s cat, but Pacho won’t have anything to do with Rusty.  Perhaps that will change when Rusty is a little bigger.

IMG_3756a IMG_3748aIMG_0702a

Building Our House – Week 25

IMG_0704e

In the foreground of this photo, you can see the roof tile and some of the gutter pieces.

Things are moving along!  The guys continue to work very hard.  These past two weeks, they have sanded the wood tablilla for the ceiling and are now in the process of applying the stain and polyurethane.

Sanding the tabilla

Sanding the tablilla

Finishing the tablilla

Finishing the tablilla

They finished the rework to the front entrance and the applying of the final finish coat on all the walls.

This is where we had a portion of the half wall torn out to improve the entrance to the house.

This is where we had a portion of the half wall torn out to improve the entrance to the house.

IMG_0712eIMG_0708e

The gutters have been installed and are in the process of being re-painted.  The first coat of paint didn’t match the roof tile very well, so that had to be adjusted.

IMG_0676eIMG_0678e

All the shower valves were plumbed and the walls patched.

The shower valve for the guest suite is plumbed with PEX tubing.

The shower valve for the guest suite is plumbed with PEX tubing.

IMG_0721e

This is the outdoor pool shower

Soon the guys will begin installing the roof tile and tiling the pool.

On another note, last week we woke up early in the morning and found that there were three dogs outside our door!  Turns out that our caretaker Lopez, adopted another dog from a friend.  Her name is Olivia and she is about eight months old.  She is very shy and sweet doggie.  Olivia is a Tico mix…we think she has some Chihauhua in her.  She is best buddies with our new kitty…yes, believe it or not, we adopted a kitten shortly after Olivia arrived.  It was a spur of the moment decision.

Olivia

Olivia

Already best buddies!

Already best buddies!

IMG_0568eIMG_0587e

Eddie and I were talking about finding an orange cat as they seem to be excellent hunters.  Not sure if that’s really true or not, but our daughter has an orange cat that is an great hunter and Lopez has an orange cat that is an awesome hunter.  We just happened to stop into the pet store in Uvita a week ago and there was an orange tabby kitty waiting for us.  We just couldn’t resist…and so we adopted him.  His name is Rusty (already given to him) and we think he is about 9 weeks old or so.  He is so cool!  Rusty has an fantastic personality.  We really enjoy playing with him and so do Olivia, Paloma and Chiquita.

IMG_0597eIMG_0622e

Time for a nap!