Activity over this last week was concentrated mostly on getting one half of the second floor concrete poured, as well as building the walls of the pool.
Upper section of the pool walls are formed and ready for concrete. In the background the forming of the crown beam be seen on the house.
The left section of the house is formed and ready to pour the concrete floor and crown beams
Routing of the supply and suction lines from the pool to the pool equipment room
This is the beginning of the pool equipment room which is dug into the front of the plantel
The pool walls have been poured.
Check out this short video of the workers moving concrete up to the second floor.
The second floor concrete is poured and forms have been removed.
Here are a couple of our wildlife friends that visited us this week at our rental house.
A fiery-billed aracari
A green iguana in the tree – to keep away from the dogs!
wow it is looking so good!
Not coming as i hate lizards, boas, ugly birds and anything with more legs i can count on one hand.
I had no idea you were such a wimp, baby brother!
Ok can come have the dogs chase away the monkies!